Where precision-built tracks meet power-packed go-karts—Sygato delivers the full-throttle thrill.

Regular Karting

FOR FAMILY AND ADVENTURE BASED AUDIENCE REQUIREMENTS:

  • Land Area - 20,000 to 87,000 Sq. Ft (0.45 acre to 2 acres)
  • Track Length 200 to 600 meters.
  • Track Type : Bitumen or Concrete.

Enquire Now

Dirt Karting

FOR FAMILY AND ADVENTURE BASED AUDIENCE REQUIREMENTS:

  • Land Area - 20,000 to 87,000 Sq. Ft (0.45 acre to 2 acres)
  • Track Length 200 to 600 meters.
  • Track type: Compacted River or Red soil.

Enquire Now

Drift Karting

FOR FAMILY AND ADVENTURE BASED AUDIENCE REQUIREMENTS:

  • Land Area - 3,700 to 20,000 Sq. Ft (0.08 acre to 0.45 acre)
  • Track Length 70 to 250 meters.
  • Track Type : Bitumen, Concrete, Cement.

Enquire Now

Professional Karting

FOR RACING AND MOTORSPORTS BASED AUDIENCE REQUIREMENTS:

  • Land Area – 1,30,000 to 5,20,000 Sq. Ft (3 acre to 12 acres)
  • Track Length 750 to 1400 meters.
  • Track Type: Bitumen, Concrete.

Enquire Now

Regular Karting

FOR FAMILY AND ADVENTURE BASED AUDIENCE REQUIREMENTS:

  • Land Area - 20,000 to 87,000 Sq. Ft (0.45 acre to 2 acres)
  • Track Length 200 to 600 meters.
  • Track Type : Bitumen or Concrete.

Enquire Now

Dirt Karting

FOR FAMILY AND ADVENTURE BASED AUDIENCE REQUIREMENTS:

  • Land Area - 20,000 to 87,000 Sq. Ft (0.45 acre to 2 acres)
  • Track Length 200 to 600 meters.
  • Track type: Compacted River or Red soil.

Enquire Now

Drift Karting

FOR FAMILY AND ADVENTURE BASED AUDIENCE REQUIREMENTS:

  • Land Area - 3,700 to 20,000 Sq. Ft (0.08 acre to 0.45 acre)
  • Track Length 70 to 250 meters.
  • Track Type : Bitumen, Concrete, Cement.

Enquire Now

Professional Karting

FOR RACING AND MOTORSPORTS BASED AUDIENCE REQUIREMENTS:

  • Land Area – 1,30,000 to 5,20,000 Sq. Ft (3 acre to 12 acres)
  • Track Length 750 to 1400 meters.
  • Track Type: Bitumen, Concrete.

Enquire Now

Track Laying Process

Preparation

  • Site Visual survey & Inspection.
  • Digital Topography Survey & Soil Testing.
  • 3D design of track according to the site & survey results.

Initiation

  • Ground Preparation and Scavenging.
  • Digital Mapping & Site Marking .
  • Earth Grading and Leveling.

Pre – Mid Phase

  • Earth Cutting & Slopping.
  • Rough Compaction & Water Curing process.
  • Sub grade Filling.

Mid Phase

  • Final Surface laying process.
  • Tire Barrier installation.
  • Kerb laying Process.
  • Testing and Trial Runs.

Finishing

  • Pit Area Set up.
  • Flood light Installation.
  • Business setup Strategy.
  • Technician Training for service and maintenance .

Discover our Cart Collections

FAQ

Our customer support is available Monday to Friday: 8am-8:30pm.

Average answer time: 24h

Call Us : +91 82200 43145

EMail: npd1@sharpgaruda.com